Benchmark Worldwide Transport supervised the discharge of a chartered vessel and the reload of equipment for a move to a site 37 miles south of the Tennessee/Mississippi border. Equipment consisted of 2 GE frames, 6 gas turbines & generators and auxiliary equipment.
Read more →Benchmark Worldwide Transport was asked to implement and coordinate the movement of 3 turbine generator sets with their accessories from Pensacola, Florida to a peak power plant under construction, located in New Albany, Mississippi. Benchmark was told that they had to improve the delivery time of any […]
Read more →Benchmark Worldwide Transport contracted to coordinate to move all of the equipment including generators, turbines and their accessories, as well as the tools and machines to overhaul these items from the warehouse/refit station in Pensacola to a new location located in Iuca, Mississippi. Benchmark used over 400 […]
Read more →Benchmark was contacted by an electrical producer in the Midwest at the beginning of December and asked to move 3 Stewart & Stevenson LM 6000 generator kits with accessories that had to move before December 31. If the equipment was not out of Texas, then the buyer […]
Read more →Benchmark Worldwide Transport coordinated the loading and stowage of 2684 cubic meters of power generation equipment purchased from Itochu Corp in Okinawa. Above is the Benchmark chartered vessel for transport to a refurbishing plant in Houston, Texas.
Read more →Benchmark Worldwide Transport encountered 19-foot tides leaving their 16 barges grounded between loading operations prior to a voyage to Masan, Korea (a suitable port for ocean heavylift vessels). In all our staff spent 3 months in Kunsan during the dismantling, packing, preparation, barge loading and lashing.
Read more →Benchmark Worldwide Transport encountered 19-foot tides leaving their 16 barges grounded between loading operations prior to a voyage to Masan, Korea (a suitable port for ocean heavylift vessels). In all our staff spent 3 months in Kunsan during the dismantling, packing, preparation, barge loading and lashing.
Read more →Benchmark Worldwide Transport coordinated the removal of a “PG6541B gas turbine (110 tons) and 96-ton generator (seen above) from EZH in Rotterdam, Holland to Senelec in Dakar, Senegal. Benchmark provided site-to-site transport for a total package of 468,500 kilograms / 1750 cubic meters with transport insurance in […]